Technical & Financial Knowledgebase

Everything you wanted to ask about going solar

Transparent answers to all your questions regarding subsidies, DISCOM net-metering, engineering safety, and lifecycle generation warranties.

MNRE Approved Installation Standards•
Tier-1 Mono PERC & TOPCon Bifacial Panels•
25-Year Linear Performance Warranty•
PM Surya Ghar Subsidy Assistance (Up to ₹78,000)•
Net-Metering Bi-Directional Discom Approval•
Zero-Cost EMI & Solar Bank Financing•
ISO 9001:2015 Certified Engineering Team•
Cyclone-Tested 150 km/h Wind-Rated GI Structures•
MNRE Approved Installation Standards•
Tier-1 Mono PERC & TOPCon Bifacial Panels•
25-Year Linear Performance Warranty•
PM Surya Ghar Subsidy Assistance (Up to ₹78,000)•
Net-Metering Bi-Directional Discom Approval•
Zero-Cost EMI & Solar Bank Financing•
ISO 9001:2015 Certified Engineering Team•
Cyclone-Tested 150 km/h Wind-Rated GI Structures•
An on-grid or grid-tied system has only panels and a grid-tie inverter — no batteries. Your load runs on solar during the day and any surplus is exported to the DISCOM through a net meter, so those units are credited against your bill. It is the cheapest per kW, needs the least maintenance, is the only type eligible for the PM Surya Ghar subsidy, and gives the fastest payback (about 3–4 years). The one limitation: for safety the inverter shuts down during a grid outage, so it gives no backup power. Best for homes, offices and factories with a reasonably stable grid supply.

Still have questions?

Our certified solar design engineers will walk you through your roof geometry, sanctioned load, and exact tariff slabs.